AVer FD2000 Manuel d'utilisateur Page 12

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 51
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 11
8
Network LED and Button Definition
2. Installation
Step 1:
Use the mounting template label to mark-out and prepare the mounting area.
Drill a round hole with Ø84 in diameter in the ceiling.
Put network cable through the round hole on the ceiling, and then attach to the camera
body.
Put camera into the round hole on the ceiling. Please hold the camera body to avoid
falling.
Vue de la page 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 50 51

Commentaires sur ces manuels

Pas de commentaire